Installation of Lodestar CL series indicators | ATRIY company news
 +971 555-998-004

Installation of Lodestar CL series indicators

Video instruction of installing fault indicators on an overhead power line without disconnecting the voltage supply. Instructions based on footage filmed at an oil company.

Lodestar CL is designed to be set permanently on the line. One indicator per phase is recommended. Using a hot stick tool the indicators can be installed under the live-line conditions with a full safety in regard to an operator.

Read 518 times


عملائنا

Contact Us

  Iris Bay 21st Floor, Office # 2105-2108, Business Bay, Dubai, UAE

 

  +971 555-998-004